The commission is of the opinion that since the power is always procured in kWh or Million Units (MU) and not in MWh. It should be specified in the PPA that the power will be procured in kWh or MU but the bidding will be done in MWh.<\/span><\/li>\n<\/ul>\n <\/p>\n","protected":false},"excerpt":{"rendered":"
UP New and Renewable Energy Development Agency (UPNEDA) and UP Power Corporation Ltd. (UPPCL) had filed a petition seeking approval for RFP & PPA for procurement of 500 MW Grid-connected solar power through tariff based competitive bidding discovering ceiling tariff-based […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[195,482,470],"tags":[916,917,515,518],"_links":{"self":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/4569"}],"collection":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/comments?post=4569"}],"version-history":[{"count":0,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/4569\/revisions"}],"wp:attachment":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/media?parent=4569"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/categories?post=4569"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/tags?post=4569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}