{"id":3423,"date":"2015-09-25T15:59:01","date_gmt":"2015-09-25T10:29:01","guid":{"rendered":"http:\/\/reconnectenergy.com\/blog\/?p=3423"},"modified":"2015-09-25T15:59:01","modified_gmt":"2015-09-25T10:29:01","slug":"merc-draft-order-on-distribution-open-access-regulations-2015","status":"publish","type":"post","link":"https:\/\/reconnectenergy.com\/merc-draft-order-on-distribution-open-access-regulations-2015\/","title":{"rendered":"MERC Draft Order on Distribution Open Access Regulations, 2015"},"content":{"rendered":"
MERC (Maharashtra Electricity regulatory Commission) came up with its draft order on 16th<\/sup> September, 2015, on new regulations for distribution open access in the state of Maharashtra. The key changes were:<\/span><\/p>\n A comparative analysis, with the previous Open Access Regulation, 2014 is given below:<\/span> The\u00a0Honorable\u00a0commission has invited comments and suggestions from various stakeholders on the same, to be submitted till 8<\/span>th<\/sup> October 2015.<\/span> MERC (Maharashtra Electricity regulatory Commission) came up with its draft order on 16th September, 2015, on new regulations for distribution open access in the state of Maharashtra. The key changes were: Reduction of Eligibility limit from 1MW to 0.5mw Allowing […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[462,431,445],"tags":[672,620,115,673],"_links":{"self":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/3423"}],"collection":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/comments?post=3423"}],"version-history":[{"count":0,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/3423\/revisions"}],"wp:attachment":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/media?parent=3423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/categories?post=3423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/tags?post=3423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}\n
\n<\/a><\/p>\n\n
\nIn our opinion, MERC has\u00a0proposed\u00a0a progressive open access regulation. In the recent past, consumers in\u00a0Maharashtra\u00a0have\u00a0faced\u00a0various issues\u00a0and\u00a0problems of availing open access (for example, allowing open access only from one source and reduction in contract demand as a result of open access). The draft regulations seeks to do-away with such restrictive practices.<\/span>
\nFurther, lowering the limit of open access eligibility to 0.5MW and allowing sourcing power exchanges will help consumers and deepen the market.<\/span>
\nClear banking provisions and wider eligibility will also be beneficial for renewable energy projects \u00a0and is likely to result in higher development of RE projects as\u00a0Maharashtra\u00a0is a RE resource rich state.<\/span>
\n\u00a0More details on the Regulation can be accessed here.<\/span><\/a><\/span>
\nThe previous MERC Open Access Regulation 2014 can be accessed here.<\/span><\/a><\/span>
\n\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"