{"id":2893,"date":"2015-03-25T19:41:03","date_gmt":"2015-03-25T14:11:03","guid":{"rendered":"http:\/\/reconnectenergy.com\/blog\/?p=2893"},"modified":"2015-03-25T19:41:03","modified_gmt":"2015-03-25T14:11:03","slug":"uperc-final-solar-rooftop-regulation-2015","status":"publish","type":"post","link":"https:\/\/reconnectenergy.com\/uperc-final-solar-rooftop-regulation-2015\/","title":{"rendered":"UPERC Final Solar Rooftop Regulation, 2015"},"content":{"rendered":"
The Uttar Pradesh Electricity Regulatory Commission (UPERC) on 20th March has notified the finalized version of the regulation for solar grid interactive systems. The regulation will allow the consumer to install solar rooftop systems under net metering or gross metering arrangements, third party systems has also been allowed. Solar Renewable Purchase Obligation –<\/strong> The Uttar Pradesh Electricity Regulatory Commission (UPERC) on 20th March has notified the finalized version of the regulation for solar grid interactive systems. The regulation will allow the consumer to install solar rooftop systems under net metering or gross metering […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[487,494,68,465],"tags":[515,518,70],"_links":{"self":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/2893"}],"collection":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/comments?post=2893"}],"version-history":[{"count":0,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/2893\/revisions"}],"wp:attachment":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/media?parent=2893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/categories?post=2893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/tags?post=2893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
\nKey Points of the regulation<\/strong><\/p>\n\n
\nThe quantum electricity generated by consumer will be considered towards the RPO of the distribution licensee if the consumer is not an obligated entity, otherwise will be considered towards RPO of consumer or third party system owner.
\nEligibility for Renewable Energy Certificate Mechanism (REC) –<\/strong>
\nThe eligibility for Renewable Energy Certificate and issuance of such REC will be as per the eligibility criteria specified under CERC REC Regulation 2010.
\nThe regulation can be accessed here<\/strong><\/a>.
\nOur previous blog on UPERC Draft Net Metering Regulation can be read here<\/strong><\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"