{"id":1538,"date":"2014-01-07T11:53:59","date_gmt":"2014-01-07T06:23:59","guid":{"rendered":"http:\/\/reconnectenergy.com\/blog\/?p=1538"},"modified":"2014-01-07T11:53:59","modified_gmt":"2014-01-07T06:23:59","slug":"andhra-pradesh-declares-appc-for-fy-2013-14","status":"publish","type":"post","link":"https:\/\/reconnectenergy.com\/andhra-pradesh-declares-appc-for-fy-2013-14\/","title":{"rendered":"Andhra Pradesh declares APPC for FY 2013-14"},"content":{"rendered":"

An order dated 28th December 2013, for determination of APPC of FY 2012-13 (for FY 2013-14), considered 6,88,79.12 MUs of power bought at \u00a022,594.78 \u00a0crore INR by discoms of the state.
\nAccordingly the APPC for FY 2013-14 is finalized to be at\u00a0Rs. 3.28\/unit<\/strong>.
\nThe following can be read on the payment adjustment issue –
\n“The difference between the provisional pooled cost of power\u00a0purchase @ Rs 2.69\/kWh (of FY 2011-12 considered for FY 2012-13) and the\u00a0pooled cost now determined shall be paid to the developer in six equal\u00a0monthly installments.”<\/em>
\nAll relevant orders on APPC in other states can be accessed <\/span>here<\/a>.<\/span>
\nOur previous coverage on APPC of FY 2012-13 in Andhra Pradesh can \u00a0be accessed
here<\/a>.<\/em>
\nThe present order can be read\u00a0
here<\/a>.
\n <\/p>\n","protected":false},"excerpt":{"rendered":"

An order dated 28th December 2013, for determination of APPC of FY 2012-13 (for FY 2013-14), considered 6,88,79.12 MUs of power bought at \u00a022,594.78 \u00a0crore INR by discoms of the state. Accordingly the APPC for FY 2013-14 is finalized to […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[96,55,56,66,68,100],"tags":[162,163,80,81,128,222],"_links":{"self":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/1538"}],"collection":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/comments?post=1538"}],"version-history":[{"count":0,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/1538\/revisions"}],"wp:attachment":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/media?parent=1538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/categories?post=1538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/tags?post=1538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}