APPC for FY11 & FY12<\/a>). The increase in APPC for CSPDCL and BSP-TEED can mainly be attributed to the fact that power purchase from central generating stations (CGS) has increased from 4789 MUs in FY11 to 8062 MUs in FY13 and short-term power purchase has almost doubled from 1215 MUs in FY11 to 2083 MUs in FY13 (courtesy: CSERC MYT Order FY11-12).<\/p>\n","protected":false},"excerpt":{"rendered":"On 14th December 2012, Hon\u2019ble Chattisgarh State Electricity Regulatory Commission (CSERC) rolled out its pooled cost of power purchase for Chhattisgarh State Power Distribution Company Ltd. (CSPDCL), Bhilai Steel Plant (BSP-TEED) and Jindal Steel (JSPL). As per this order, APPC […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[96,110,68,57,148],"tags":[81,210,105,133,84,95],"_links":{"self":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/1122"}],"collection":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/comments?post=1122"}],"version-history":[{"count":0,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/posts\/1122\/revisions"}],"wp:attachment":[{"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/media?parent=1122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/categories?post=1122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reconnectenergy.com\/wp-json\/wp\/v2\/tags?post=1122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}