slot machine jackpot casino,mutation slots horse life http://www.slotln.online Thu, 08 May 2014 08:02:23 +0000 en-US hourly 1 https://wordpress.org/?v=5.8.1 http://www.slotln.online/wp-content/uploads/2021/09/cropped-maroonsym-32x32.png Govt. Directive – REConnectEnergy http://www.slotln.online 32 32 APERC to be reorganized soon http://www.slotln.online/aperc-to-be-reorganized-soon/ Thu, 08 May 2014 08:02:23 +0000 http://www.slotln.online/blog/?p=1799 Following the mandate of the Andhra Pradesh Reorganization Act, 2014, the state of Telangana is set to be carved out of present day Andhra Pradesh. The Act was gazetted on 1st March 2014 and the bifurcation will be done on 2nd June 2014. The power sector in AP is set to have a major turnaround and APERC in connection to this has made public an important regulation – a draft of APERC (Reorganization) 2014. The public notice is available here.

The draft regulation can be read here.

]]> Gujarat bans sourcing power from other states http://www.slotln.online/gujarat-bans-sourcing-power-from-other-states/ Tue, 25 Mar 2014 07:13:22 +0000 http://www.slotln.online/blog/?p=1727 Gujarat government has recently banned its state distribution companies from buying power from other states. These discoms will now have to procure power from state power generators.

Power procurement from state power generators means industries will now have to shell out more money from their pockets. The increase of Rs. 2.75 per unit is expected, taking the net power cost per unit touching Rs. 7.

As per an article in Economic Times, industries in Gujarat route around 1000 MW from other states via power exchanges while 2500 MW of state power generation companies are sitting idle.

GETCO; state transmission company has written letters to 125 industries, quoting the following:

“Due to rise in the system load demand, leading to grid constraint in the upstream network, it shall not be feasible to permit short-term open?access to consumers as per enclosed list with effect from March 20,”

The decision has also taken into consideration the intent to reduce solar power tariff in the state. The state is said to have tied up for 950 MW at a higher solar tariff as against the requirement of 350 MW under solar obligation.

Aggrieved by the move, which is seriously questioning the viability, the industries association of the state are going to give a presentation to the govt. in the coming days.

An article in Economic Times can be accessed here.

]]>