how do you unlock build slot destiny 2 final shape,penny slot machines http://www.slotln.online Mon, 22 Jun 2015 14:11:20 +0000 en-US hourly 1 https://wordpress.org/?v=5.8.1 http://www.slotln.online/wp-content/uploads/2021/09/cropped-maroonsym-32x32.png Draft Solar Tariff – REConnectEnergy http://www.slotln.online 32 32 HPERC Proposes Tariff for Solar Projects http://www.slotln.online/hperc-proposes-tariff-for-solar-projects/ Mon, 22 Jun 2015 14:11:20 +0000 http://www.slotln.online/blog/?p=3193 The Himachal Pradesh Electricity Regulatory Commission (HPERC) has notified a draft on 16th June 2015 for the calculation of solar energy tariff in the state. The proposed tariff will be applicable for the projects where PPAs are signed on or before 31.03.2016 and the entire capacities covered by the PPAs are commissioned on or before 31.03.2017.
The details of the proposed tariff are given in the table below:

The proposed tariff by the commission is slightly higher (approx. 1.6%) than the tariff determined by CERC, which can be considered as a promotional move by the commission to encourage the slowly growing sector in the state.
The comments and suggestions on the proposed draft has been invited by the honorable commission, which can be submitted by any interested party or industry stake holders latest by 16th July 2015.
The commission order can be accessed here.

]]>
GERC (Gujarat) Proposes Tariff for Solar Projects http://www.slotln.online/gerc-gujarat-proposes-tariff-for-solar-projects/ Mon, 15 Jun 2015 12:17:38 +0000 http://www.slotln.online/blog/?p=3163 The Gujarat Electricity Regulatory Commission (GERC) in a draft notified earlier this month has proposed tariff for the solar projects. The Tariff proposed in the Discussion Paper will be applicable to the projects commission during July 1, 2015 to March 31, 2018. The commission through a separate public notice has invited comments and suggestions from the interested stake holders by 22nd June 2015.
The details of the tariffs proposed are in the table below:

Below is the graph for comparison between tariffs of CERC and GERC for previous years:

Wheeling Charges:

  • For Injection at 66 kV voltage level and above, transmission charges as applicable to normal open-access customers and transmission and wheeling loss @ 7% of the energy fed into the grid.
  • For Injection at 11 kV or above and below 66 kV, wheeling in the area of the distribution licensee will be allowed on payment of distribution loss @ 3% of the energy fed in to the grid. In the other case of wheeling within the State but in the area of a different distribution licensee will be allowed on payment of transmission charges as applicable to normal Open-Access Customers and transmission and distribution loss @ 10% of the energy fed in to the grid.

Cross subsidy Charges: As a promotional measure for solar power no cross-subsidy surcharges would be levied in case of third-party sale.
It is worth noticing that GERC had calculated its tariffs back in 2012 for coming years I.e. FY 13, FY14 & FY 15, while CERC revises its tariffs every year. The difference visible between tariffs of CERC and GERC for previous years is because the GERC hasn’t revised its tariff after 2012 and it is that period during which the capital cost of the solar modules fell drastically and so the difference didn’t reflect on the tariffs of GERC as it wasn’t revised.